Clear the play area before the crew arrives, but leave heavy framing in place. The useful preparation is information: dimensions, materials, anchor points and the path to the loading area.
Before the estimate
- Photograph all four sides and the ground at each post.
- Measure the overall footprint and tallest point.
- List slides, swings, climbing walls, roofs and loose accessories.
- Show the narrowest gate and any stairs.
- Point out lighting, power or other installed features.
Before the work date
- Remove toys and personal items from the surrounding yard.
- Keep children and pets away from the work zone.
- Move fragile planters, furniture and decorations off the carry route.
- Confirm where reusable accessories should be placed.
- Arrange parking or gate access for the agreed arrival window.
Anchors change the job
Some playsets rest on the surface. Others use buried stakes or posts set in concrete. A photo at each leg helps identify what is visible, but hidden conditions may only become clear during dismantling. Decide in advance whether below-grade anchors should be removed, cut back or left for a later contractor.
Need help with playset removal?
Review the working scope, then call with photos and access details.
See Playset Removal