A fence-removal request should name the parts: panels, rails, gates, posts and concrete footings. Removing panels alone leaves a different yard and a different workload than pulling every post.

Confirm the line first

Verify ownership and the agreed property line before work starts. If the fence is shared, get the needed approval and decide how the exposed side will be secured after removal.

Use this scope table

PartQuestion to answer
Panels and railsHow many linear feet and what material?
GatesWhat width, hardware and attachments?
PostsCut at grade, loosened, or fully removed?
FootingsDoes the concrete stay or leave?
VegetationWhat must be protected or trimmed by the owner?

Look below grade

Posts may sit in concrete near irrigation, lighting or buried utilities. Do not treat post removal as ordinary surface work until conflicts have been checked. Mark any known lines and discuss utility locating when excavation is part of the scope.

Plan the temporary edge

Removing a fence can open a yard to streets, neighbors and pets. Decide how the property will be secured between removal and replacement. The removal crew should know the replacement schedule, but should not promise temporary construction that is outside the agreed work.